Permit for Utility Work in the Right-of-Way

A Right of Way Permit application is required to be submitted to the City for all new facilities that are constructed within the City’s rights of ways whether it is an aerial, at ground level or below ground installation.

The Right-of-Way Use Permit application can be found here.