Mississippi River Bike Path

Mississippi River Bike Path

                Funding:              $373,360.00  Federal TAP (Transportation Alternatives Program)

                                            $389,630.43  Local or MFT

                Timeline:             Anticipate Construction 2022

                Status:                  Hutchison Engineering is the selected consultant for engineering.  Project survey is underway now.

                Description:          The scope of this project is to move the bike path to run along the Mississippi River between 17th Street & the           new I-74 bridge.