Traffic Signals at River Drive & University Drive

Traffic signals will be installed in 2019 at the intersection of River Drive & University Drive. These signals are being installed in coordination with the IHMVCU development.

This project will include the signal installation, sidewalk improvements, and additional turn lanes.

This project is funded through development funds.

Timeline:  Summer / Fall 2019

Contractor: T.B.D.

Capital Improvement Project: #1314

Funds: 

  • Other $250,000

Contact: Darrel Preston, Construction Manager

              (309) 524-2355

              dpreston@moline.il.us