Show All Answers

1. Why does Moline have a Drainage Permit?
2. Do I need a permit?
3. When will my site be inspected?
4. If I don’t need a permit, do I still need erosion control?
5. Why is the permit threshold (500 square foot land disturbance) so low?
6. Why is the Drainage Permit fee so expensive?
7. I took out the Drainage Permit but someone else (homeowner, subcontractor) violated the Ordinance. Why am I in trouble?
8. I’m a contractor / homebuilder / landscaper not an erosion control company. How do I learn about erosion control?
9. Do I have to hire an engineer to obtain a permit?
10. What if I already started the project?
11. How long does it take to obtain a permit?