36th Avenue Bike Path, 7th – 13th Street

36th Avenue Bike Path, 7th – 13th Street

                Funding:              $259,175.00  Federal TASA (Transportation Alternatives Set-Aside)

                                            $64,797.00  Local or MFT

                Timeline:              Anticipate Construction 2022

                Status:                  Project engineering has not begun.  Engineering design will be done in-house.

                Description:          An off-road bike path will be installed on the south side of 36th Avenue between 7th Street & 13th Street.                     Future path will continue from 13th Street east, pending funding.