2019 Trenchless Water Main Project, Location #2

The second location of the 2019 trenchless water main project is 11th Street, South of 23rd Avenue.

The project will include trenchless water main construction, including services. Other work will include pavement patching, sidewalk repairs, and landscaping as necessary.

This project is funded through local utility revenue.

This project was chosen due to the need to replace the discolored water mains.

Timeline: Fall 2019

Contractor: T.B.D.

Capital Improvement Project: #1315

Funds:

• Water $70,000

Contact: Darrel Preston, Construction Manager

                (309) 524-2355