2018 Asphalt Project, Location #1

2018 Asphalt Project, Location #1

32nd Street, between 24th and 25th Avenues, will be resurfaced with asphalt as part of Moline’s 2018 Asphalt Project.  This is location #1 of 3.

The project will include an asphalt overlay of the existing pavement.  Other work will include pavement patching, curb repairs, sidewalk improvements, driveway repairs, drainage improvements, and other related work.

This project is being funded using 100% tax funds for electric and gas usage.

This location was chosen because the existing concrete pavement is in adequate condition, meaning it doesn’t need reconstructed, however the pavement life could be extended if overlaid with asphalt.

Timeline:  Summer / Early Fall 2018

Contractor:  Langman Construction

Capital Improvement Project:  #1287

Funds:

  • Tax on Electric and Gas Usage $95,000

Contact:  Darrel Preston, Construction Manager

                 (309) 524-2355